References

The PROMETHEUS® GmbH has supervised approval procedures for more than 80 wind turbines in the inland with an installed service of more than 150 MW throughout the twenty years of its existence.

 

Among these, approx. 112 MW were constructed and began operation before the end of 2014. 40 MW more will follow in 2015 and 2016. The following lists some examples of successful project development:

Windpark Proschim

– 4 x AN Bonus AN600/44

– total power 2,4 MW

– approval: 1997

WKA Duben

– DeWind D4-46 (600 kW)

– power 0,6 MW

– approval: 1998

Windpark Säritz

– 2 x DeWind D4-46 (600 kW)

– total power 1,2 MW

– approval: 1999

Windpark Lugau 

– 3 x DeWind D4-48 (600 kW)

– total power 1,8 MW

– approval: 1999

WindparkKarche-Zaacko

– 2 x DeWind D4-48 (600 kW)

– total power 1,2 MW

– approval: 2000

Windpark Massen 

– 2 x DeWind D6 – 1.000

– total power 2,0 MW

– approval: 2000

Windpark Kotschka

– 3 x DeWind D6 – 1.000

– total power 3,0 MW

– approval: 2000

Windpark Drehnow

– 8 x NecMicon NM 82-1.500

– total power 12,0 MW

– approval: 2004

WKA Schorbus 1 

– Vestas V 80 – 2.0 MW

– power 2,0 MW

– approval: 2005

WKA  Saathain 1  

– Vestas V 90 – 2.0 MW

– power 2,0 MW

– approval: 2006

WKA Saathain 2 

– Enercon E 53 – 800 kW

– power 0,8 MW

– approval: 2006

Windpark Eichow 1

– 6 x Vestas V 90 – 2.0 MW

– total power 12,0 MW

– approval: 2006

WKA Schorbus 3 und 4 

– 2 x Vestas V 90 – 2.0 MW

– total power 4,0 MW

– approval: 2007

WKA Schorbus 2 

– Vestas V 90 – 2.0 MW

– power 2,0 MW

– approval: 2009

Windpark Bönitz

– 3 x Enercon E 48 – 800 kW

– total power 1,8 MW

– approval: 2010

Windpark Duben 

– 20 x Vestas V 90 – 2.0 MW

– total power 40,0 MW

– approval: 2011

WKA Vetschau 

– Vestas V 90 – 2.0 MW

– power 2,0 MW

– approval: 2011

WKA Schorbus 5  

– Enercon E 53 – 800 kW

– power 0,8 MW

– approval: 2012

WKA Jehserig 

– Vestas V 90 – 2.0 MW

– power 2,0 MW

– approval: 2012

Windpark Vetschau   

– 6 x Nordex N 117-2.400

– total power 14,4 MW

– approval: 2014

Windpark Eichow 2  

– 5 x Siemens SWT 2.3-113

– total power 12,0 MW

– approval: 2014
Further own projects and order plans inland and abroad are currently in the pipeline. In addition to planning wind turbines, studies, assessments and other project services are in the task portfolio of the PROMETHEUS GmbH. You can find a selectionin the  list of references.